Data and privacy
Unlawful data use, weak provenance, poor data quality, excessive retention, personal data leakage, and inappropriate secondary use.
AI Governance Consulting
29/08/2026
Nuvexia builds AI risk registers and control frameworks that connect specific risks, including bias, data leakage, model drift, security threats, supplier exposure, and regulatory breaches, to controls, accountable owners, review dates, and residual risk ratings. We align the work with ISO/IEC 42001, NIST AI RMF, and MAS guidance where relevant.
A useful register is tied to real systems and decisions. It should help risk owners see what could go wrong, which controls reduce the exposure, whether those controls operate, and who must act next.
| Register field | What it should record |
|---|---|
| AI system and use case | The model, product, vendor tool, or automated process that creates the risk |
| Risk statement | The cause, event, and potential effect on people, operations, compliance, or the business |
| Inherent risk | Likelihood and impact before controls are considered |
| Controls | Preventive, detective, and corrective measures linked to evidence |
| Owner | The person accountable for treating and reviewing the risk |
| Review schedule | The regular cadence and events that trigger an earlier review |
| Residual risk | Remaining exposure after controls, including acceptance or further action |
Unlawful data use, weak provenance, poor data quality, excessive retention, personal data leakage, and inappropriate secondary use.
Inaccurate outputs, changing performance, weak validation, automation bias, and failure for particular user groups.
Prompt injection, adversarial inputs, insecure integrations, excessive permissions, unavailable services, and weak incident response.
Undisclosed subprocessors, model changes, unclear accountability, contractual gaps, and failure to meet applicable rules.
The register can also cover ethical, reputational, financial, operational, and business-continuity risks. Categories should match the organisation's existing enterprise risk language where possible.
Identify in-house systems, vendor products, AI embedded in business software, pilots, and employee use that creates material exposure.
Bring together business owners, engineering, data, security, privacy, legal, compliance, procurement, and internal audit as needed.
Connect each risk to current and planned controls, evidence, testing methods, and relevant framework requirements.
Name owners, calculate residual risk, agree treatment actions, and document who can accept exceptions.
Establish quarterly review as a baseline, with earlier updates for deployments, material changes, incidents, and control failures.
Nuvexia can map one operating register to several requirements. ISO/IEC 42001 provides an AI management system and risk process. NIST AI RMF organises work through Govern, Map, Measure, and Manage. MAS guidance adds sector expectations for regulated financial institutions.
The result should not be three separate lists that drift apart. A control mapping can show which entries support each framework while risk owners work from one current register.
A governance policy sets organisation-wide rules, principles, roles, and decision rights. A risk register tracks specific exposure for actual systems, including controls, owners, review dates, and residual risk.
Review it at least quarterly and after any material trigger. Triggers include a new deployment, model or data change, supplier change, control failure, incident, drift, or relevant regulatory update. Higher-risk systems may need monthly or continuous monitoring alongside the formal register review.
Yes. We map AI risks to the existing taxonomy, scoring scale, control library, ownership model, and reporting cycle. Nuvexia can provide a structured register for the client's chosen governance, risk, and compliance system, so the organisation does not need a competing risk method.